Making your Power BI reports more portable and collaborative with relative paths
This practical guide walks you through how to set up relative paths in Power BI, helping you and your team avoid broken links when sharing reports or moving files.
Contents
- Absolute vs relative paths
- Why do you need relative paths?
- Introduction of two methods
- Method 1: connecting a new data source
- Method 2: changing the connection of an existing data source
Stay in touch
If you would like to receive news and updates about training, tech tips, resources and opportunities for small charities and community groups in London please sign up to our mailing list.